Departmental Papers (ESE)
Abstract
The purpose of this project has been to plan line pairings in the unified Regional High Speed Lines (RHSL) network when the Center City Tunnel is opened. While detailed schedules were not part of this project, headways and train consists have been determined for all lines for peak and off-peak periods.
Document Type
Technical Report
Date of this Version
5-1984
Publication Source
Report for the Southeastern Pennsylvania Transportation Authority (SEPTA)
Copyright/Permission Statement
Originally prepared for SEPTA by the University of Pennsylvania.
Included in
Systems and Communications Commons, Systems Engineering Commons, Transportation Engineering Commons
Date Posted: 27 February 2019