General Operations Plan for the SEPTA Regional High Speed System
Loading...
Penn collection
Departmental Papers (ESE)
Degree type
Discipline
Subject
Electrical and Computer Engineering
Engineering
Systems and Communications
Systems Engineering
Transportation Engineering
Engineering
Systems and Communications
Systems Engineering
Transportation Engineering
Funder
Grant number
License
Copyright date
Distributor
Related resources
Author
Kikuchi, Shinya
Contributor
Abstract
The purpose of this project has been to plan line pairings in the unified Regional High Speed Lines (RHSL) network when the Center City Tunnel is opened. While detailed schedules were not part of this project, headways and train consists have been determined for all lines for peak and off-peak periods.
Advisor
Date Range for Data Collection (Start Date)
Date Range for Data Collection (End Date)
Digital Object Identifier
Series name and number
Publication date
1984-05-01