Selecting R&D Projects at BMW: A Case Study of Adopting Mathematical Programming Models

Loading...
Thumbnail Image
Penn collection
Operations, Information and Decisions Papers
Degree type
Discipline
Subject
Mathematics
Funder
Grant number
License
Copyright date
Distributor
Related resources
Author
Loch, Christoph. H
Christian, Michael. T
Terwiesch, Christian
Urbschat, Michael
Contributor
Abstract

Research and development (R&D) project selection is a critical interface between the product development strategy of an organization and the process of managing projects day-to-day. This article describes the project selection problem faced by an R&D group of BMW (Munich, Germany). The problem was structured as minimizing the gap between target performance of the technology to be developed and actual performance of the current technology along chosen criteria. A mathematical programming model helped this organization to increase the transparency of their selection process, which previously had been based on experience coupled with evaluation of individual projects in isolation Implementation was a success in that the predevelopment group continues to use the model to make better decisions. However, the organization did not use the model for its intended purpose: constrained optimization. The traditional explanation for this partial implementation is that the analytical model did not capture all considerations relevant to optimization (e.g., uncertainty or strategic fit), and that further model refinements are required to achieve further implementation. We offer an alternative explanation, one based on the technology transfer literature. The diffusion of the analytical model from academia to industry faced the same problems as any technology transfer: Significant tacit knowledge had to be transferred along with the codified knowledge of the analytical model. This required iterated problem solving, which required the limited time and resources of the diffusing agents (academia) as well as the adopting agents (industry). Thus, the organization adopted only those elements of the modeling method that could be transferred within the resource constraints, focusing on those elements offering the highest benefit per effort invested.

Advisor
Date Range for Data Collection (Start Date)
Date Range for Data Collection (End Date)
Digital Object Identifier
Series name and number
Publication date
2001-02-01
Journal title
IEEE Transactions on Engineering Management
Volume number
Issue number
Publisher
Publisher DOI
Journal Issue
Comments
Recommended citation
Collection