MC-ADAPT: Adaptive Task Dropping in Mixed-Criticality Scheduling

Loading...
Thumbnail Image
Penn collection
Departmental Papers (CIS)
Degree type
Discipline
Subject
CPS Model-Based Design
CPS Real-Time
Computer Engineering
Computer Sciences
Funder
Grant number
License
Copyright date
Distributor
Related resources
Author
Lee, Jaewoo
Chwa, Hoon Sung
Shin, Insik
Contributor
Abstract

Recent embedded systems are becoming integrated systems with components of different criticality. To tackle this, mixed-criticality systems aim to provide different levels of timing assurance to components of different criticality levels while achieving efficient resource utilization. Many approaches have been proposed to execute more lower-criticality tasks without affecting the timeliness of higher-criticality tasks. Those previous approaches however have at least one of the two limitations; i) they penalize all lower-criticality tasks at once upon a certain situation, or ii) they make the decision how to penalize lowercriticality tasks at design time. As a consequence, they underutilize resources by imposing an excessive penalty on lowcriticality tasks. Unlike those existing studies, we present a novel framework, called MC-ADAPT, that aims to minimally penalize lower-criticality tasks by fully reflecting the dynamically changing system behavior into adaptive decision making. Towards this, we propose a new scheduling algorithm and develop its runtime schedulability analysis capable of capturing the dynamic system state. Our proposed algorithm adaptively determines which task to drop based on the runtime analysis. To determine the quality of task dropping solution, we propose the speedup factor for task dropping while the conventional use of the speedup factor only evaluates MC scheduling algorithms in terms of the worst-case schedulability. We apply the speedup factor for a newly-defined task dropping problem that evaluates task dropping solution under different runtime scheduling scenarios. We derive that MC-ADAPT has a speedup factor of 1.619 for task drop. This implies that MC-ADAPT can behave the same as the optimal scheduling algorithm with optimal task dropping strategy does under any runtime scenario if the system is sped up by a factor of 1.619.

Advisor
Date of presentation
2017-10-01
Conference name
Departmental Papers (CIS)
Conference dates
2023-05-17T18:48:07.000
Conference location
Date Range for Data Collection (Start Date)
Date Range for Data Collection (End Date)
Digital Object Identifier
Series name and number
Volume number
Issue number
Publisher
Publisher DOI
Journal Issue
Comments
International Conference on Embedded Software (EMSOFT 2017)(http://esweek.org/emsoft/about), Seoul, South Korea, October 15 - 20, 2017
Recommended citation
Collection